Estimating & Design Services by State
We estimate and design in Texas, Florida, California, New York, Georgia, Illinois, Arizona, Virginia, North Carolina, Ohio, Washington, Pennsylvania, and Tennessee, covering MEP, architectural and structural scope against each state's energy code, procurement rules, and climate profile. Most standard estimates for these and all other states are delivered within 24-48 hours.
What Actually Changes When You Cross a State Line
A national square-foot number hides all of this. These are the six things that move an MEP estimate between states, and they are the first things we confirm before a single unit price gets applied.
| What changes | Example | Where it hits the estimate |
|---|---|---|
| Which code edition is in force | Georgia still permits on a 2015 IECC-based code. California moved to the 2025 Title 24 on January 1, 2026 | Envelope, lighting power density and equipment efficiency baselines shift before any labor rate is applied |
| Who actually enforces it | Arizona has no statewide commercial energy code, so each city adopts its own edition and amendments | Same drawings, different compliance path. The AHJ gets confirmed before pricing, not after |
| The climate zone | California assigns a zone by street address. Washington splits marine Zone 4C from eastern 5B | Heating versus cooling capacity, economizer thresholds, dehumidification and freeze protection |
| Seismic and wind exposure | New Madrid in west Tennessee, Cascadia in Washington, HVHZ in Miami-Dade and Broward | Restraint, anchorage and product approval stop being notes and become counted quantities |
| Wage law and bid structure | Pennsylvania public work runs four separate primes under the Separations Act. California public work carries prevailing wage | The labor basis and the bid structure change, not just the hourly rate |
| Utility and capacity limits | Data center load in Loudoun and Columbus, water and service capacity in Arizona | Service size, utility coordination and equipment lead time can drive the schedule harder than price |
Code editions change on their own schedule. We confirm the edition in force on the permit submittal date, not the edition printed on an older drawing set.
Cities We Have Priced In Detail
A state page covers the code and the climate. A city page covers the permit desk, the submarkets and what actually drives the number inside that metro.
Common Questions
Why does my state affect the MEP estimate?
Energy code, climate, and labor conditions vary by state. California's Title 24 and Texas's cooling-dominant climate drive HVAC sizing very differently, and prevailing wage rules change labor pricing on public work.
Do you estimate projects outside the states listed here?
Yes. We serve all 50 US states. These 13 state pages cover our highest-volume markets, but we apply the same code-specific approach to any state energy code and climate profile.
Can you combine a state page's code requirements with my industry?
Yes. We apply the state's energy code, climate, and labor conditions on top of the building-specific systems and compliance standards covered on our industry pages.
How fast can I get a state-specific MEP estimate?
Most state-specific estimates are delivered within 24-48 hours of receiving complete drawings, the same turnaround as our standard trade estimates.
MEP Estimating Guides by State
Need a State-Specific Estimate?
Submit your drawings and we'll scope the estimate around your state's code and climate.