BIM Coordination & Clash Detection for MEP
BIM coordination runs Navisworks clash detection across mechanical, electrical, and plumbing models for design teams and contractors catching conflicts before construction. Turnaround depends on model complexity and the number of trades involved. We confirm the schedule with your quote. Estimates are billed at $30-$45 per hour.
Navisworks-based clash detection, coordination meeting support, and RFI reduction for mechanical, electrical, and plumbing systems.
BIM coordination exists to solve one specific, expensive problem: two trades designing in isolation end up occupying the same physical space, and nobody finds out until a pipe is already hung where a duct was supposed to go. We federate mechanical, electrical, and plumbing models with architectural and structural models in Navisworks and run clash detection to catch both hard clashes, actual physical overlaps between two elements, and soft clashes, clearance and access violations where equipment technically fits but can't be serviced or accessed once installed. Soft clashes get missed more often than hard clashes in a quick visual review, because the geometry doesn't actually overlap, it's the access and maintenance clearance around it that's the problem.
How we deliver clash results depends on how your project runs coordination. Some teams want clash reports on a regular cycle, weekly or biweekly during the coordination phase, organized by location and priority, so their own project team can run coordination meetings and assign resolution responsibility internally. Other teams want us at the table directly, attending coordination meetings to walk through each clash with the mechanical, electrical, plumbing, and fire protection trades present, proposing routing changes in real time rather than just flagging the conflict and handing it off. We scope the engagement to match how your project actually coordinates, not a one-size-fits-all reporting format.
The real payoff of BIM coordination shows up in RFI volume once construction starts. Most field RFIs on MEP-heavy projects trace back to a conflict between trades that nobody caught during design, a duct routed through the same space a structural beam occupies, a pipe run that blocks access to a piece of equipment, an electrical panel that can't open because ductwork was installed six inches too close. Every one of those conflicts, resolved in a coordination model before construction, is an RFI, a change order, and a schedule delay that never happens. We track clash resolution to closure, not just clash identification, since a clash report that nobody acts on provides the same field outcome as never running coordination at all.
Every Deliverable, Itemized
- Model federation across MEP, architectural, and structural disciplines in Navisworks
- Hard clash detection (physical overlaps) and soft clash detection (clearance/access)
- Clash reports organized by location and priority, delivered on a regular cycle
- Optional attendance at coordination meetings with the full trade team
- Clash resolution tracking through to closure, not just identification
- Coordination support through design development, CDs, and pre-construction phases
Is This Service Right for You?
- General contractors running formal BIM coordination on MEP-heavy projects
- Mechanical, electrical, and plumbing subcontractors needing clash-free installation drawings
- Design-build teams coordinating multiple trade models before issuing for construction
- Projects with tight ceiling plenums, mechanical rooms, or shaft risers prone to trade conflicts
Turnaround Depends on Scope, confirmed with your quote.
Common Questions
What software do you use for clash detection?
We run clash detection in Navisworks, federating MEP, architectural, and structural models to identify hard clashes (physical overlaps) and soft clashes (clearance and access violations) before they reach the field.
Do you attend coordination meetings or just run the clash reports?
We can do either. Many projects just need clash reports delivered on a regular cycle for the GC or design team to run their own coordination meetings, while others want us to attend coordination meetings directly to walk through clashes and proposed resolutions with the full trade team.
How does BIM coordination reduce RFIs?
Most field RFIs on MEP-heavy projects trace back to a conflict between trades that wasn't caught before installation, a duct and a structural beam in the same space, a pipe routed through a spot a conduit already occupies. Resolving those conflicts in the coordination model before construction removes the RFI before it's ever written.
Learn More About BIM Coordination & Clash Detection for MEP