Electrical Takeoff Services
Electrical takeoff counts conduit, wire, panels, devices, fixtures, and gear from single-line diagrams and panel schedules, built for electrical contractors and estimators preparing a bid. Most takeoffs are delivered in 24-48 hours, with pricing typically $300-$2,500 depending on project size. Estimates are billed at $30-$45 per hour.
Conduit, wire, panels, devices, fixtures, and gear counts, cross-checked against the panel schedule.
An electrical takeoff is only as good as its cross-checking, and that's where we spend most of our review time. We start from single-line diagrams and panel schedules, then take off conduit footage by size and type (EMT, rigid, PVC, flexible) and wire or cable footage by conductor size and insulation type, matching every circuit on the floor plan to a circuit in the panel schedule. That reconciliation step catches the discrepancies that cost money later, a circuit shown on the drawing but missing from the schedule, a breaker size that doesn't match the connected load, or a homerun that's longer than the plan suggests once routing around structural obstructions is accounted for.
Devices and fixtures are counted by type, not lumped into a single generic count. Receptacles are broken out by standard duplex, GFCI, isolated ground, and dedicated circuits; switches by single-pole, three-way, dimmer, and occupancy-sensor types; and lighting fixtures by fixture type, mounting, and circuit assignment. This level of detail matters because labor units differ meaningfully between a standard duplex receptacle and a dedicated isolated-ground circuit for sensitive equipment, and an estimate that treats them the same will misprice labor on any project with more than a handful of specialty circuits, which describes most commercial and healthcare work.
Switchgear, switchboards, panelboards, and transformers are scheduled as their own line items, separate from the bulk conduit, wire, and device material. Each piece of gear is noted with voltage, ampacity, and AIC (interrupting capacity) rating, since these specifications drive both cost and lead time independently of the branch wiring scope. We also flag long-lead gear early in the estimate, main switchboards and large transformers in particular, so your team has visibility into procurement risk before the bid is finalized, not after award. The finished deliverable is a CSI-organized, line-item report broken down by system type, ready for your team to review, adjust, or submit directly.
Every Deliverable, Itemized
- Conduit footage takeoff by size and type (EMT, rigid, PVC, flexible)
- Wire and cable footage by conductor size and insulation type
- Panel and gear schedules with voltage, ampacity, and AIC rating noted
- Device counts by type: receptacles, switches, dimmers, occupancy sensors
- Lighting fixture counts by type, mounting, and circuit assignment
- Circuit-by-circuit reconciliation against the panel schedule
Most Standard Estimates in 24-48 Hours: exact timeline confirmed with your quote.
Common Questions
What's included in an electrical takeoff?
Our electrical takeoff includes conduit footage by size and type, wire and cable footage by conductor size and insulation type, panel and gear schedules, device counts (receptacles, switches, data/power combo plates), and lighting fixture counts by type, all cross-checked against the panel schedule.
Do you cross-check quantities against the panel schedule?
Yes. Every circuit we take off from the plan is reconciled against the panel schedule's circuit count and breaker sizing, which catches drawing discrepancies, like a circuit shown on a floor plan but missing from the schedule, before they turn into a bid-day gap.
Can you take off switchgear and distribution equipment separately from branch wiring?
Yes. Switchgear, switchboards, panelboards, and transformers are scheduled and priced as their own line items with voltage, ampacity, and AIC rating noted, separate from branch circuit conduit, wire, and devices, since gear lead times and pricing work differently than bulk electrical material.