MEP as-built drawings document what was actually installed in the field, covering mechanical, electrical, and plumbing systems for facility owners, engineers, and contractors closing out a project. Turnaround depends on building size and redline completeness. We confirm the timeline with your quote. Estimates are billed at $30-$45 per hour.
Field-verified record drawings and closeout documentation for mechanical, electrical, and plumbing systems.
What gets built almost never matches the design drawings exactly, field conditions force routing changes, equipment substitutions happen, and change orders modify scope in ways the original drawing set never reflects. As-built documentation exists to close that gap, and the process starts with field-marked redlines, physical or digital markups showing what was actually installed versus what the design intended. We work from redlines that already exist on a project, or verify field conditions directly when redlines are incomplete, inconsistent, or the installation deviated significantly enough from the design that redline markups alone can't be trusted to tell the whole story.
Record drawings are the clean, final deliverable produced from that field-verified information, converted into finished CAD or Revit documents that accurately represent the completed installation rather than the original design intent. We rebuild duct, pipe, and conduit routing, equipment locations, and system connections to match what's actually in the building, cross-referencing against change orders and RFI responses issued during construction to make sure every approved deviation gets captured in the final documentation, not just the changes someone happened to mark on a redline set in the field.
As-built and record drawings matter most after the project is finished, when a facility team needs to locate a valve, trace a circuit, or plan a renovation years down the line, and the only documentation available is whatever was produced at closeout. Most owner contracts and public project specifications require as-built documentation as part of the closeout package specifically because of this long-term value, accurate record drawings are cheaper to produce once, during closeout, than to reconstruct later through field investigation when nobody on the original project team is still involved. We deliver the final package in the format your closeout requirements specify, whether that's PDF record drawings, native CAD files, or an updated Revit model reflecting as-built conditions.
Every Deliverable, Itemized
- Field verification of installed conditions where redlines are incomplete or unreliable
- Redline capture and conversion into clean CAD or Revit record drawings
- Cross-referencing against change orders and RFI responses for full accuracy
- Mechanical, electrical, and plumbing systems documented as actually installed
- Closeout package formatting to match owner or contract specification requirements
- Delivery in PDF, native CAD, or updated Revit model format as required
Is This Service Right for You?
- General contractors assembling closeout documentation at project completion
- Owners and facility managers who need accurate records for future maintenance
- Subcontractors required to submit as-built drawings as part of contract closeout
- Design teams updating a Revit model to reflect final as-built conditions
Turnaround Depends on Scope, confirmed with your quote.
Common Questions
What's the difference between as-built drawings and record drawings?
The terms are often used interchangeably, but as-built typically refers to field-marked redlines showing what was actually installed, while record drawings are the clean, finished CAD or Revit documents produced from those redlines. We take a project through both stages, field verification and redline capture, then final record drawing production.
Do you physically verify field conditions or just redraw the redlines?
We can do either depending on what's needed. Where field redlines already exist and are reliable, we convert them directly into clean record drawings. Where redlines are incomplete or the installation deviated significantly from the design, we verify field conditions directly before producing the final documentation.
Are as-built drawings required for project closeout?
Most owner contracts and many public project specifications require as-built or record drawings as part of the closeout package, since the owner needs accurate documentation of what's actually in the building for future maintenance, renovation, and facility management.
Learn More About MEP As-Built Drawings
Ready to Get Started?
Submit your field redlines or as-built documentation request for a closeout-ready record drawing package.